Fire-rated door projects

A fire-rated opening is an assembly decision, not simply a choice of door face. Use this guide to prepare a project brief; it does not certify a product or establish the required rating for your building.

Commercial corridor door concept with a closer and metal frame, not a certified assembly
Illustrative concept, not a completed project or a product certification.

01 / Project considerations

Begin with the approved requirements

Ask the project design team to identify the required rating and other requirements for each opening under the applicable jurisdiction. Include the opening ID, location and schedule notes. Room names alone do not determine a universal rating, and fire, smoke and acoustic requirements should be recorded separately.

02 / Project considerations

Review the whole assembly

The leaf, frame, glazing, latching, closing hardware, seals and installation details need to be coordinated with the applicable listing and project requirements. A decorative design, material name or separate component label is not sufficient evidence for the complete opening.

03 / Project considerations

Confirm what is actually supported

Before accepting a rated proposal, request the relevant manufacturer and listing documentation, permitted dimensions and configurations, and any restrictions on preparation or field modifications. This category is a scope-review pathway: no particular rating, certification or approved supply capability is being claimed here.

Continue exploring.

Project questions

Do you supply fire rated doors?
Openings with a fire requirement are reviewed against the documentation the project requires. No rating is claimed for a door style on its own: performance belongs to the reviewed assembly, so the requirement is confirmed in the quotation rather than assumed from a catalogue page.
What should I send for a fire rated door opening?
The opening schedule with the required rating, wall type and thickness, leaf and frame details, hardware, and the submittal requirements of the project. Those details are what the assembly is reviewed against.