01 / Project considerations

Product and assembly information

Request the manufacturer, product designation, construction details and current document revision. Where performance is required, obtain the relevant listing or test documentation and confirm its relationship to the proposed size, glazing, frame and hardware configuration.

02 / Project considerations

Drawings and preparation details

Coordinate door and frame schedules, elevations, hardware templates and finish schedules. Identify the version and approval status of each document. A superseded drawing or an unspecified hardware preparation can change what is being quoted.

03 / Project considerations

Review responsibilities

Separate supplier documentation from the project designer’s requirements and authority approvals. Have qualified reviewers resolve discrepancies before ordering or modifying an assembly. Keep a record of the accepted specification, limitations and revision dates for future maintenance or replacement.

Continue exploring.

Project questions

Which documents should I request for a door project?
Opening schedule, door and frame details, finish references, hardware specification and any submittal requirements the project enforces. Pannello reviews those documents before quoting.
Do you provide shop drawings?