Project planning guide
Hospitality & hotel doors
A hotel door project brings design and procurement into the same conversation. Separate guest entries, connecting rooms, public spaces and service areas before reviewing finishes or quantities.

01 / Project considerations
Guest entries and connecting rooms
Capture the design intent, acoustic target, lock preparation and the opening-specific performance requirements. Connecting-room arrangements need their own details rather than being treated as a copy of the guest entry. Any combined fire and acoustic claim must be supported for the exact proposed assembly.
02 / Project considerations
Public and back-of-house areas
Consider traffic, cleaning, protection hardware and replacement needs for lobbies, restaurants and service spaces. Provide the approved requirements for corridors and stairwells. A common finish can coordinate the appearance, but it does not make every opening technically interchangeable.
03 / Project considerations
Plan the procurement sequence
List quantities by opening type, required samples, hardware templates and renovation phases. Identify delivery destinations and milestone dates for review. Availability, lead times and delivery arrangements are confirmed in the quotation rather than promised by the category page.
Continue exploring.

Acoustic door requirements
Coordinate privacy targets with whole-opening performance evidence.
Explore category
Fire-rated door projects
Start with the opening schedule and documented assembly requirements.
Explore category
Designs & finishes
Prepare a design and finish brief that can be quoted accurately.
Explore category